> ## Content Index
> Fetch the complete content index at: https://www.communityforwardredlands.com/llms.txt
> Use this file to discover other available public pages before exploring further.

# Redlands to resurface 44 streets with $1.97M in state funding
- URL: https://www.communityforwardredlands.com/redlands-to-resurface-44-streets-with-1-97m-in-state-funding/
- Published: 2025-06-26T01:47:05.000Z
- Updated: 2025-06-27T14:08:33.000Z
- Description: Work begins fall 2025 on dozens of deteriorating street segments, funded by California’s SB1 transportation tax.
- Author: Kathryne Mccann
- Tags: Government, Development

REDLANDS, Calif. — Redlands City Council unanimously approved a major street improvement project aimed at enhancing safety and mobility across the city during their June 17 meeting. The 2025 Street Resurfacing Project, adopted via Resolution No. 8693, targets 44 street segments for repair and rehabilitation.

**Why it matters:** Funded through California’s Senate Bill 1 (SB1) Road Repair and Accountability Act, the project is expected to receive $1.97 million in state funding for the upcoming 2025–2026 fiscal year. These funds, generated by fuel taxes and vehicle registration fees, are dedicated to addressing road maintenance, rehabilitation and safety needs at both the state and local level.

**Details:** This project is part of the city’s Pavement Management Program (PMP), which identifies aging or deteriorated roads in need of resurfacing. Streets selected for repair were identified based on need, traffic volume and long-term pavement performance.

Each segment included in this year’s list is expected to provide at least 20 years of service life.

This is the ninth year that Redlands has received SB1 funding. In total, the 2025 resurfacing effort will span approximately 45 lane miles of roadway.

Planned work includes slurry sealing, crack filling and thin asphalt overlays, along with more intensive rehabilitation such as asphalt grinding and replacement, hot mix overlay, traffic loop replacement, manhole rim adjustments and updated striping.

**Moving forward:** The work is expected to begin during the fall of 2025 with an estimated construction timeline of 6 months. 

Below is a list of the 44 street segments selected for repair as part of the 2025 Street Resurfacing Project:

1. **4th St** – Fern Ave to Cypress Ave
2. **Alessandro Rd** – Crescent Ave to Creekside Dr
3. **Brockton Ave** – Texas St to Orange St
4. **Buena Vista St** – Olive Ave to Fern Ave
5. **Cajon St** – Citrus Ave to Highland Ave
6. **Calhoun St** – Colton Ave to Brockton Ave
7. **Carrie Ln** – La Verne St to Dead End
8. **Church St** – Pennsylvania Ave to Colton Ave
9. **Church St** – Citrus Ave to Central Ave
10. **Citrus Ave** – Eureka St to University St
11. **Colton Ave** – 6th St to Church St
12. **Colton Ave** – University St to Grove St
13. **Columbia St** – Colton Ave to Brockton Ave
14. **Country Club Dr** – Mariposa Dr to Verde Vista Dr
15. **Country Club Dr** – Verde Vista Dr to Country Club Dr
16. **Crescent Ave** – Alessandro Rd to Center St
17. **Dearborn St** – San Bernardino Ave to Sessums Dr
18. **Delaware Ave** – Clay St to Orange St
19. **Devonshire Dr** – Reservoir Rd to Crestview Rd
20. **Edgemont Dr** – Edgemont Dr to Dead End
21. **Edgemont Dr** – Lantern Crest Dr to Edgemont Dr
22. **Eureka St** – Fern Ave to Cypress Ave
23. **Fairmont Dr** – Edgefair Ln to Edgemont Dr
24. **Fern St** – Terracina Blvd to San Timoteo Canyon Rd
25. **Franklin Ave** – Summit Ave to Oak St
26. **Grand View Dr** – Summit Ave to Summit Ave
27. **La Verne St** – Cypress Ave to Fern Ave
28. **Lantern Crest Dr** – Edgemont Dr to Dead End
29. **Lawton St** – Colton Ave to Lugonia Ave
30. **Marigold Ave** – San Bernardino Ave to Palmetto Ave
31. **Mariposa Dr** – Country Club Dr to Wabash Ave
32. **Michigan St** – Olive Ave to Glenwood Dr
33. **Myrtle St** – Fern Ave to Olive Ave
34. **Palmetto Ave** – Marigold Ave to California St
35. **Panorama Point Dr** – Sunset Dr to Dead End
36. **Redlands Blvd** – Kansas St to Texas St
37. **San Bernardino Ave** – Mountain View Ave to California St
38. **San Bernardino Ave** – Woodbury St to Church St
39. **Sun Ave** – Texas St to Orange St
40. **Sunset Dr** – S Ridge St to Mariposa Dr
41. **Sunset Dr** – N Wabash Ave to Calle Solesar
42. **Terracina Blvd** – Brookside Ave to Fern Ave
43. **Union Ave** – Texas St to Tribune St
44. **Washington St** – Lugonia Ave to Pennsylvania Ave